It is a great pleasure to announce that TAI successfully sent the last container to Mauban coal fired power plant. The speciality of this project is where TAI did complete design & drawing , Qty survey , take off ...
It is a great pleasure to announce that TAI successfully sent the last container to Mauban coal fired power plant. The speciality of this project is where TAI did complete design & drawing , Qty survey , take off ...
TAI provided complete turnkey supply of insulation for the complete package of Rapid / Petrofac / package 4 , TAI supplied almost 3000 tonnes for the RAPID including 600 tonnes for Package 4 to Petrofac
TAI provided complete technical / installation training to Meisei for installation of Solartech GRP PE 55. A major breakthrough for TAI to get approval for Solartech GRP / Precured instead of specified branded products with saipem / Total France